Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Manually setting up/modifying parameters on the Meters in order to run the Task to Increase the Price on of the Meter charge.

Expand
titleNOTE

Check the system reference for the number of decimal places required for the price ex gst GST increase on the meter price.
Readysell>Administration>Advanced>System Types
Type = Service
Code = "AUTO-INCREASE-METER-CHARGE-DECIMAL-PLACES" 
Value = enter the number of decimal places for the price ex eg 4

A task is what generates the increase in meter pricing.
You can have this task enabled and scheduled to run or you can run it manually yourself.
Navigate to Task>Auto Increase Meter Charges
Turn the Tick on the check Box Enabled and click on Save
The task has a scheduled time. You can leave this if it is not blank.
Restart the service. (speak to Readysell if need be)


...

Note

There is a check box on each of the Meter prices that . This check box governs whether you want to increase this meter product price type if you should have more than one-meter product price type on a meter.
If the check box 'Exclude' is ticked, then any meter pricing for that meter type on that meter will be excluded when the task runs
Image Removedto increase the meter pricing.

Image Added


Image Added

If the check box is OFF (not ticked) on any meter product price and there is an Auto increase set up on that meter, the pricing will update based on the values in the Auto increase setup for each meter when the task runs.

...

Info

Scenarios/Formula/Examples

Field: Auto Increase Price Percentage = insert the % value by which you want to increase the price ex meter price on the meter

Formula : (meter price ex * %/100) + price ex

Scenario with just auto increase price percentage on the Mono meter Monometer

Price Ex on the Mono Meter with a type = Count is $200 $0.015 ex gstGST
Auto Increase Price Percentage has a value of 10%

Calc = $0.0179 015 * 10/100 = $0.00179 0015 increase in price for that meter
$0.00179 0015 Price increase + price ex of $0.0179  015  = $0.01969 0165 (round up depending of system reference for number of decimal places ) = new price ex $0.0197 0165
Task runs to increase the meter price
Image Removed

Set up below auto increase on the meter of Mono

Meter price on the Mono meter before the auto increase:


Image Added
Image Added

After the task runs the result on the mono meter is shown below
Image Added

Image Added

Colour meter same machine different percentage of 5%

Image Added

The result after the task ran for the colour meter

Image Added

Image Added



Scenario with just auto increase price percentage and auto increase price before factor on the Mono meter

Field : Auto increase price percentage on this monometer = 10%
Field : Auto Increase Price before Factor = $0.10 ( has to be a $value not a percentage)
Field: Auto Increase Price After Factor $0 ( has to be a $value, not a percentage)

Formula = (Price Ex Gst + $value in auto increase price before factor)$ 0.10 * %/100 (Price Ex Gst + $value in price factor )
Eg monometer
Price = price to be increase by

Price to be increased by + Original Price Ex Gst 

Eg mono meter

The price ex on the mono meter with a type of Count is $0.1.210165
Auto increase before Price factor =$ 0.10
Auto Increase Price Percentage = 10%

Calc =( old price ex $1$0.21 0165 + autoincrasepricebeforefactor 0.10)= $1$0.31 1165 * (autoincreasepicepercentage autoincreasepricepercentage *10/100)= $0.31 = (1.31 +0.31) =$1.441 new price $1.31 *10%01165
(Price Ex Before increase + autoincreasepricebeforefactor of $0.1165+ Increase price $0.01165) =$0.12815 new price ex for that meter (rounding to 4 decimal places so the price ex increase will be $0.1282

Result = (0.0165 + 0.10) = $0.1165 * 10/100 = $0.31

Result = $1.31 +$0.31= $1.441 price ex increased to

Image Removed01165 price increase value

Old price ex plus to pricefactorbefore =$0.1165 + 0.01165 = $0.12815 new price ex increased to 

Price set up before the task

Image Added

Image Added

The result after the task runs:

Image Added

Image Added


Scenario with just auto increase price percentage and auto increase price after factor on the Mono meterMonometer

Field : Auto increase price percentage on this mono meter = 10%
Field : Auto Increase Price before Factor = $0.00 ( has to be a $value, not a percentage)
Field: Auto Increase Price After Factor $0.015 ( has to be a $value, not a percentage)


Work out the price increase firstly

Then add the value of the priceafterfactor 

Image Added


Image Added

Formula = (Price Ex Gst  * %10%/100) +  (Price Ex Gst + increase result) + $value in price factor after)
Eg mono meter
Price ex on the mono meter with a type of Count is $1.441
Auto increase Pirce after factor =$ 0.10Auto Increase Price Percentage = 10%


Calc =( old price ex $1.441  * (autoincreasepicepercentage $0.1282 *10/100))= $0.1441 + original price ex $1.441 + increase % $0.1441 = $1.5851 + auto increase price after factor $0.10 = $1.6851 price ex 

$1.441 *10%/100 =  $0.1441

Result = $1.441 + $0.1441 $1.5851

$1.5851 + $0.10 = $ 1.6851 

Image Removed

Setup

01282 (to increase by)

$0.1282 (old price ex) + increase price value $0.01282 = $0.14102 increase price ex 

$0.14102 + $0.015 (autoincreasepriceafterfactor) = $0.15602 new price ex 

Result =( $0.1282 *10/100) = $0.14102 (price increase by)

$0.14102 + $0.015 = $0.15602 new price ex


Image Added


Image Added

Setup

Meter Product Prices to be excluded from the price increase

  1. Firstly ensure to flag the meter product price types you want to exclude be excluded from the auto increase meter price. You do not have to increase the prices on all meter types
  2. Set up the auto-increase rules for each meter type Machine>meter>prices>add each meter type eg Count then the rule, then add another for Minimum and then the rules etc
  3. Either activate the task or control the price increase task manually

How to exclude a meter from an increase in price

...

Search for the Machine Id and highlight it

...

If you don't want a price increase to happen on a particular meter/type tick the check box on the Meter Prices tab 'Exclude'

...

titleShow me

...

Auto Increase Setup on each meter for each type

  1. Log onto Readysell>Service>Machine>highlight a machine>highlight a meter click on the tab 'AutoIncreases' on each of the meters

    ExpandImage Removed

    If you should have more than one-meter product price type on a meter, you can Add/Change any meter product price to be Excluded from the price increase by clicking on the check box 'exclude' check box.

  2. Navigate to the machine

  3. Highlight the meter

  4. Click on Tab > Prices

  5. Highlight the meter type if you have more than one type on that meter that you wish to be excluded and click on the check box of 'Excluded' 

  6. Click on Save
    This meter product price will not be increased.

    Expand

    Image Added


Auto Increase rules on the Meter

  1. On each meter ensure to set up the values required
  2. Navigate to the machine
  3. Search and highlight the machine in question
  4. Ensure to review your meter product prices firstly noted above 'Meter Product Prices to be excluded from the price increase'
  5. Then stay on the same meter, click on the tab 'Auto Increases'
  6. Review the date in the field 'last increase date'. If you are setting up this rule the first time around, ensure the date is today if you are wanting the price increase task to run tonight.
  7. Insert into the field 'Auto Increase Months' when you want the next increase to happen. Eg 12 means in 12 months time from the last increase date
  8. For each type, insert the right values for either Auto increase Price Percentage, Auto increase price before factor value, or Auto increase price after factor value by clicking on New  
    1. Last Auto Increase: is a date field. If you are just starting to use this feature then set this date to be the start date. If the task has run prior, the system will populate and update the date to be the last date the task ran.
    2. Auto Increase Months: Enter the number of months before the next auto increase meter price task runs
    3. Auto Increase Price Percentage : Enter the Percentage you wish the meter price to increase for each of the meter types.
    4. Auto Increase Price Before Factor : Enter a dollar value if you wish to increase the meter price by a $value before applying the percentage increase
    5. Auto Increase Price After Factor: Enter a dollar value if you wish to increase the meter price by a $value before applying the percentage increase
  9. Click on Save
  10. Either wait for the task to run if enabled or run it manually.
  11. Set up each price increase on each meter on each meter type.
  12. Click on Save

  13. Once you have done that click Save and repeat the steps for all the meters on that machine and on all other machines 
  14. Image Added

  15. When the task runs, the audit trail is shown on each meter in the auto increases tab under the Charges
    Image Added


  16. Either activate the task or control the price increase task manually (speak to readysell)


You can run a List Report called 'Auto Increase Meter Charge Report' L-080. Add any extra fields that you require to the report. Check the report before the task runs for the initial run.

Expand
titleShow me

Image Modified


Once all the parameters are set up on the appropriate machine. meters, you need to run the following task manually the first time around and then set it to run automatically.

...

Once the task has run, the system stores a log on each Machine Meter within the tab of 'Auto Increases>Charges'.Image RemovedIncreases'

Expand

Image Added

Image Added



Giving you the Old price/New Price/Auto Increase Price Percentage/Auto increase Price Factor
Or old minimum charge, new minimum charge, old price, new price, auto increase percentage, auto increase price, and updated date stampBefore Factor/Auto Increase Price After Factor.


Readysell suggests that you set up a few meter price increase on some meters on the test TEST database BEFORE LIVE,
Run the Task and check the results before attempting in Live.

...